项目案例Projects

钢最后要落在
别人看得见的地方。
Steel ends up
where people can see it.

这一页的项目名称、总包单位、工程范围,都按合同与报价单原档的口径写:加冷、南北走廊、盛顿道、PSA 港区,加上两单在投。件数、体积、毛重取自装箱单,可按编号核对。 Project names, main contractors and scope on this page follow the contract and quotation wording: Kallang, the North-South Corridor, Shenton Way and PSA, plus two live tenders. Piece counts, volume and gross weight come from the packing list and can be checked against its reference.

首页Home / 项目案例Projects
26.67t 单批临时支撑钢量One propping batch
1,113m 隧道标段长度Tunnel section
20,000m 单标段围挡量Hoarding, one contract
107.881m³ 单批出口体积Export batch volume

数据源:L32 报价单 Fortis/2026/L32/CHEC/018 · N108 总规格图 W/N108/TUN/TMP/4401 · RC218 报价单 · 加冷装箱单 JL260507 Sources: L32 quotation Fortis/2026/L32/CHEC/018 · N108 specification drawing W/N108/TUN/TMP/4401 · RC218 quotation · Kallang packing list JL260507

在施 · 中国港湾LIVE · CHEC

加冷 Kallang Close 围挡工程Kallang Close hoarding works

CHECBP01909025CHEC/KLC/WO/0042026.10 开工

总包:中国港湾工程有限责任公司新加坡分公司(Co. Reg. T22FC0016H)。范围:预制混凝土墩基础、3/5/7 米固定及移动彩钢与 Prestige 围挡、大门、照明及防雷接地。合同按实做实量结算(Remeasurement),适用新加坡法律、SIAC 仲裁。PE 设计认证、LEW/EMA 申报、基础开挖弃土回填均含在单价内,废水不得排入加冷河。 Main contractor: China Harbour Engineering Co. Ltd, Singapore Branch. Scope: precast concrete pad footings, 3/5/7 m fixed and mobile colour-steel and Prestige hoarding, gates, lighting and lightning earthing. Re-measured contract under Singapore law with SIAC arbitration. PE design certification, LEW/EMA submissions and excavation, disposal and backfill all sit inside the rates; no discharge to the Kallang River.

在施 · 中铁一局LIVE · CRFG

南北走廊 N108 基坑钢支撑N108 North-South Corridor strutting

CRFGLTAR10 区S355

业主:新加坡陆路交通管理局(LTA);总包:中铁一局集团有限公司新加坡分公司(CRFG);顾问:GeoAlliance Consultants。标段位于 Marymount Lane 与 Pemimpin Place 之间,全长 1,113 米,单层双跨地下隧道,地下连续墙结合钢内支撑围护。Fortis 供 R10 区 Section 4A/4B/4C/4D1A 各层钢支撑:双拼 H 型钢 S355,主力截面 UB610×324×174 与 195 kg/m,长度 17.0–17.6 m,间距 5.3–6.0 m,预加力 100–650 kN。 Owner: Land Transport Authority. Main contractor: China Railway First Group Co., Ltd. Singapore Branch; consultant GeoAlliance Consultants. The section runs between Marymount Lane and Pemimpin Place — 1,113 m of single-level twin-cell tunnel with diaphragm walls and internal steel struts. Fortis supplies the R10 zone (sections 4A/4B/4C/4D1A): twin S355 H-sections, mainly UB610×324 at 174 and 195 kg/m, 17.0–17.6 m long at 5.3–6.0 m centres, preloaded 100–650 kN.

在施 · 中国港湾LIVE · CHEC

8 Shenton Way L32 转换层临时支撑8 Shenton Way, L32 temporary supports

CHEC26.67 tLevel 32L32T_R1

总包:中国港湾工程新加坡分公司。项目为盛顿道综合体开发。工作在 32 层,做转换层临时支撑工字钢的制作、安装与拆除,按 L32T SUPPORTING BEAM_R1 图出件。钢量约 26.67 吨:H457×191×82、H533×210×122、H254×146×32、H203×133×30 四档 S355 型钢,配 PL20 系列连接板与两组装配式钢牛腿,另含 M20 螺栓等辅材。范围明确含卸车、倒运、吊装校正、栓焊打磨与完工拆除。 Main contractor: China Harbour Engineering, Singapore Branch, on the 8 Shenton Way mixed-use development. The work sits at Level 32: fabrication, installation and dismantling of temporary transfer-level supporting beams to drawing L32T_R1. Roughly 26.67 t of S355 in H457×191×82, H533×210×122, H254×146×32 and H203×133×30, with PL20 connection plates and two assembled steel corbels, plus M20 bolts and consumables. Scope explicitly covers unloading, handling, rigging, alignment, bolting, welding, grinding and final dismantling.

已交付 · 港区DELIVERED · MARINE

PSA 新加坡港务集团项目PSA Singapore terminal works

PSA围挡Hoarding信号塔Comms tower冷藏平台Reefer deck

PSA 是全球最大的集装箱中转枢纽。我们承担港区围挡、通信信号塔钢结构、冷藏集装箱平台钢结构的深化设计、采购、工厂制作与现场安装全过程。临海高腐蚀环境,涂层体系按现场腐蚀等级配置,构件出厂前完成抛丸与涂装,到场直接安装。 PSA operates the world's largest container transhipment hub. We delivered the terminal hoarding, communications tower steelwork and reefer-platform structures through detailing, procurement, fabrication and site installation. In a high-corrosivity marine environment the coating system follows the site category, with blasting and painting completed before despatch.

出口与在投Export & live tenders

三个柜,怎么分的。Three containers, and how they were split.

围挡系统有一批以散件出口:16,338 件、80 包件、净重 56,136 kg,按 40HQ 单柜 67 m³ / 26,000 kg 双向限额配柜。三柜都没到限重,最紧的柜二留了 4,497 kg 余量。 One batch of the hoarding system shipped as loose pieces: 16,338 pieces, 80 packages, 56,136 kg net, allocated against both a 67 m³ volume limit and a 26,000 kg payload limit per 40HQ. None reached its limit; the tightest, No.2, kept a 4,497 kg margin.

围挡系统出口批 · 装箱单 JL260507 · 40HQ × 3Hoarding export batch · packing list JL260507 · 40HQ × 3
柜号Unit 体积 m³Volume 体积装载率Vol. fill 净重 kgNet kg 毛重 kgGross kg 载重率Payload 包件Pkg
NO.136.94055.1%21,09021,29081.9%39
NO.225.79038.5%21,30321,50382.7%13
NO.345.15067.4%13,74313,94353.6%28
合计Total107.881—56,13656,736—80
项目台账Project register
SG-01加冷 Kallang Close · 围挡工程 · 中国港湾 · 在施Kallang Close · hoarding works · CHEC · live
SG-02南北走廊 N108 · 基坑钢支撑 · 中铁一局 / LTA · 在施N108 North-South Corridor · strutting · CRFG / LTA · live
SG-038 Shenton Way L32 · 转换层临时支撑 26.67 t · 中国港湾 · 在施8 Shenton Way L32 · temporary supports 26.67 t · CHEC · live
SG-04PSA 港区 · 围挡 / 通信信号塔 / 冷藏集装箱平台钢结构 · 已交付PSA terminal · hoarding / comms tower / reefer deck · delivered
SG-05RC218 Tuas South Boulevard · 临时围挡 20,000 m · 中国港湾 · 投标中RC218 Tuas South Boulevard · hoarding 20,000 m · CHEC · tendering
SG-06KTC 临时钢便桥 · 钢结构供货 220 t 含涂层 · 投标中KTC temporary vehicular bridge · 220 t supply with coating · tendering

说明:项目名称、总包与工程范围按合同及报价单口径;件数、体积、毛重取自装箱单,可按编号核对。本页只列项目与供货范围,不披露合同金额与甲方内部信息。 Note: project names, main contractors and scope follow the contract and quotation wording; piece counts, volume and gross weight come from the packing list and can be verified by reference. This page lists scope only — contract values and client internal information are not disclosed.